one360 Engineering
EN
← Back to news
Electric vehicles

Iberdrola passes 97,000 installed charging points, mostly private

The company reports over 85,000 points in homes and businesses and over 12,000 public points in Spain. This is its activity report, not the country’s total charger count.

Illustration: Iberdrola charger on Avenida Pintor Joaquín Sorolla, Málaga, 17 June 2022; not a new October 2026 installation or a One360 site.
Daniel Capilla · resized · CC BY-SA 4.0: https://creativecommons.org/licenses/by-sa/4.0/ — Illustration: Iberdrola charger on Avenida Pintor Joaquín Sorolla, Málaga, 17 June 2022; not a new October 2026 installation or a One360 site.

What was announced

Iberdrola España published a deployment update on 15 October 2026 reporting more than 97,000 installed charging points. The figure combines private and public installations associated with its activity. It is neither Spain’s total nor 97,000 new points installed this month.

The company reports over 85,000 points in homes and businesses, alongside over 12,000 for public use. The private category includes both customer groups; it must not be read as 85,000 homes equipped with chargers.

Iberdrola says its current pace exceeds 100 installations a day. It also reports more than 2,000 a month for individuals, nearly 100 for businesses and over 200 public points. These are company deployment figures, rather than a live availability map for every connector.

For a homeowner, the relevant development is the scale of private charging alongside public infrastructure. Charger selection still depends on the vehicle, electrical installation, available power and daily routine. Network growth alone cannot establish a particular home’s installation price or charging savings.

What it means for your home

Plan home charging alongside household loads, with public charging supporting trips. Deployment totals do not replace an assessment of the home’s installation.

Source

Iberdrola España installs more than 100 charging points a day

Announcement date: 15.10.2026
Source checked: 16.10.2026

Image: Daniel Capilla · resized · CC BY-SA 4.0: https://creativecommons.org/licenses/by-sa/4.0/ — Illustration: Iberdrola charger on Avenida Pintor Joaquín Sorolla, Málaga, 17 June 2022; not a new October 2026 installation or a One360 site.

Read the original publication

One home. One engineering team.

Let’s start with your home.

WhatsApp